SHORT RUN PRODUCTION TOOL EXAMPLE PROJECT
Goal
  • 1 cavity prototype tool
  • Sharp corners
  • Hold tolerances of +/- 0.001
  • 10 day lead time
  • Material: Delrin
  • Build prototype mold to sustain production need for 1 year (50,000 shots).
Solution
  • 1 cavity steel mold
  • Samples provided in 4 days
  • Mold has ran 60,000+ pieces to date
  • Mold transferred to Metro for production needs. Transit time - 2 weeks.

PARTS ONLY EXAMPLE PROJECT
Goal
  • 1 cavity rapid prototype tool
  • Utilize slides
  • Sharp corners
  • 15 day lead time
  • Material: polycarbonate
  • Build rapid injection mold for part design verification... 200 parts only
Solution
  • 1 cavity steel mold
  • All 200 parts provided in 12 days
  • Additional 200 parts after engineering - change provided in 3 days.
  • Mold remained at tool source. Customer went on to build 12 cavity production mold with Metro with no required changes.

PRODUCTION MOLD EXAMPLE PROJECT
Goal
  • 1 cavity rapid prototype tool
  • Complex Geometry
  • Sharp corners
  • 4 week lead time
  • Utilize Metro Tooling Standard
  • Material: glass filled Nylon
  • Build production tool and submit samples to customer for approval
  • Ship mold to customer for production.
Solution
  • 1 cavity steel mold
  • 20 Samples provided in 3½ weeks
  • Samples approved by customer
  • Mold shipped to customer... transit time 2½ weeks.

PROTOTYPE MOLD/BRIDGE TOOL EXAMPLE PROJECT
Goal
  • 1 cavity prototype tool
  • Deep interior pocket
  • Utilize both LIFTERS and SLIDES
  • 4 week lead time
  • Material: Glass filled PC V-0
  • Build mold and run 1,000 pcs at tool source then ship to Metro Plastics for future orders.
Solution
  • 1 cavity steel mold (H13 mold inserts)
  • 12 samples provided in 4 weeks.
  • samples after EC - 3 days.
  • Mold has ran 20,000 pcs to date

INSERT MOLDING EXAMPLE PROJECT
Goal
  • 1 cavity bridge tool
  • Heat staked threaded insert
  • Inserts provided by customer
  • 2 week lead time
  • Material: ABS V-0 material
  • Build mold and run 2,000 pcs at tool source
  • Tool to remain at tool source
Solution
  • Insert molded threaded insert
  • samples provided in 9 days
  • samples after EC - 2 days
  • Mold ran 9,500 pcs while 6 cavity production mold being built.

Additional Images of Our Projects

Example Rapid Injection Molding Project ImageExample Rapid Injection Molding Project Image
Example Rapid Injection Molding Project ImageExample Rapid Injection Molding Project Image